1.證書
2.套筒扳手
3.艙底水
4.配電盤
5.廢氣鍋爐
6.調速器
7.日用櫃
8.模擬機
9.膨脹水櫃
10.(生活)污水艙(櫃)
1. SOLAS
2. SMS
3. PSCO
4. SEEMP
5. ODP
6. IMO
7. CE
8. IHP
9. SCR
10. HFO
1. Dismantle, clean and reassemble the fuel oil filter.
2. There is an oil leakage from the seal of the hydraulic oil pump.
3. Take out the turning gear.
4. Smell to see if there is any abnormal odor.
5. Have you got any test report for the air compressors on hand?
6. What's your suggestion for this repair?
7. Will you have the certificate extended?
8. Pay a lot of attention to the boiler.
9. Rectify the deficiency at the next port.
10. How often do they need charging?
1. A: What fire-fighting apparatus have you got on board?
2. B: We've got lots, such as fire pumps, fire extinguishers and sand.
3. A: How often do you have the extinguisher checked?
4. B: Usually once a year.
5. A: Are the winches in good order?
6. B: Not very good, the hydraulic motor has worn out.
7. A: Have all of the order stores been brought on board?
8. B: Yes, the ship chandler sent them yesterday.
9. A: How much fuel oil is reserved on board?
10.B: About 400 tons.
11.A: By the way, can I transfer some fuel oil?
12.B: How much and how do you want to transfer it?
13.A: 50 tons from No. 1 starboard to No.2 port.
14.B: Yes, you can. Please keep in touch.
15.A: How does the main engine work?
16.B: It has a little trouble.
17.A: What's the problem?
18.B: A leakage was found in No.5 injector pump.
19.A: Have you taken some measures?
20.B: No. You know, we can't renew it while the main engine is running.
1. Q1: What preparation procedures shall be carried out before departure? (2%)
2. The main engine cylinder shall feed cylinder oil and the main engine shall be turned by engaging the turning gear for about 10 minutes then be disengaged. (2%)
3. The stand-by diesel engine generator shall be started and put into service. (2%)
4. The necessary pumps shall be started. (2%)
5. Starting manifold drain valves shall be shut and the starting air outlet valve of the air reservoirs shall be opened. (2%)
6. The main engine indicator cocks shall be closed after the main engine is blown through. (2%)
7. After permission has been received from the Captain, the main engine may be tested on dead slow ahead and astern momentarily, from the control console in the engine control room. This procedure shall only be carried out after obtaining the permission of the Captain. (3%)
8. Upon engine of SBE, all required parameter readings shall enter into the Bell Book and Engine Logbook. (2%)
9. Clean the seawater-cooling strainer and check the check valve function of the stand-by seawater-cooling pump. It may be jammed by mud sediment from the port during a long port stay. (3%)