11. Provision must be made in pipe systems for changes in length due to change of temperature, both in the pipe and machinery items which they join. What kind of equipment is above description?
(A) Quick connecting joint
(B) Flange joint
(C) Expansion joint
(D) Welding joint

答案:登入後查看
統計: A(91), B(144), C(683), D(59), E(0) #1585201

私人筆記 (共 1 筆)

私人筆記#3495863
未解鎖
必須在管道系統中對由於溫度變化而導致的長...
(共 101 字,隱藏中)
前往觀看
9
0