11. Provision must be made in pipe systems for changes in length due to change of
temperature, both in the pipe and machinery items which they join. What kind of equipment is
above description?
(A) Quick connecting joint
(B) Flange joint
(C) Expansion joint
(D) Welding joint
私人筆記 (共 1 筆)
未解鎖
必須在管道系統中對由於溫度變化而導致的長...