1798. 公共工程應由符合CNS 17025(ISO/IEC 17025)規定之實驗室辦理,並出具檢驗或抽驗報告,下列何者為非?
(A)鋼筋
(B)混凝土
(C)瀝青混凝土
(D)以上皆非
答案:
登入後查看
統計:
A(12), B(6), C(27), D(114), E(0) #3320571
詳解 (共 1 筆)
MoAI - 您的AI助手
B1 · 2025/10/11
#6877125
1. 題目解析 本題主要考察的是公共工...
(共 875 字,隱藏中)
前往觀看
1
0
其他試題
1794. 公有建築屋頂防水隔熱工程預算金額87萬元,招標文件內編列品管費用之額度,下列何者為非?(A)24,000元(B)12,000元(C)10,000元(D)以上皆非
#3320567
1795. 機關辦理新臺幣100萬元以上工程,應於相關採購案之招標文件內編列品管費用應依?(A)工程規模及性質(B)營造業法(C)標準法(D)職業安全衛生法
#3320568
1796. 污水下水道推進工程採購預算金額1億6000萬元,應編列品管費用,下列何者為非?(A)以招標文件內品管人員設置規定為依據(B)訂有專職及人數等規定者,以人月量化編列為原則(C)未訂有專職及人數等規定者,以百分比法編列為原則, (D)含材料設備抽(檢)驗費用
#3320569
1797. 公共工程應由符合CNS 17025(ISO/IEC 17025)規定之實驗室辦理,並出具檢驗或抽驗報告,該報告應印有依何法案授權之實驗室認證機構之認可標誌?(A)政府採購法(B)營造業法(C)標準法(D)職業安全衛生法
#3320570
1799. 監造單位現場人員應專職,不得跨越其他標案,且監造服務期間應在工地執行職務之預算金額門檻?(A)100萬元(B)5,000萬元(C)2億元(D)以上皆非
#3320572
1800. 監造單位應於何時現場人員之登錄表,報經機關核定後,由機關填報於工程會資訊網路備查?(A)工程決標後(B)工程訂約後(C)開工前(D)開工後
#3320573
251 When a motorcycle is on a lane, which is not divided into fast lanes and curb lanes and without traffic signs or markings, it should be on the 2 lanes towards the right side. On a one-way street, however, the motorcycle should be on (A) the lane on the left side (B)the lane on the right side (C)all of the above.
#3320574
252 A motorcycle rider should follow the signs or markings on a motorcycle lane. When merging from 2 lanes into 1 in an area without signs or markings, the vehicle that is going straight has the right-ofway. If there is no straight lane, (A)the vehicle on the right lane should yield to the vehicle on the left lane (B)the vehicle on the left lane should yield to vehicles on the right lane (C)all of the above.
#3320575
253 When a motorcycle is turning at an intersection, follow the instructions of the signs or markings. In an area without signs and markings, and the fast lane is marked with "no motorcycle", (A)make a hook turn (B)the motorcycle can turn left directly from the fast lane (C)turn left from the other lanes.
#3320576
254 When arriving at an area with signs or marking for a curve, slope, bridge, tunnel, intersection, or construction, or an area with a level crossing or construction site, (A)it is ok to pass another vehicle (B)honk to warn others and pass (C)passing is not permitted.
#3320577