2 Before starting the project, the engineer consulted the ____ for site details.
(A) timetable
(B) budget
(C) receipt
(D) map

答案:登入後查看
統計: A(1), B(0), C(0), D(4), E(0) #3821197

詳解 (共 1 筆)

#7293561
題目翻譯:在開始這個工程之前,工程師查...
(共 118 字,隱藏中)
前往觀看
0
0