33.During , the ship is secured to the pier with mooring lines while the main engines are used to
drive the propeller.
(A)shop trials
(B)sea trials
(C)dock trials
(D)launched
答案:登入後查看
統計: A(71), B(107), C(193), D(24), E(0) #604662
統計: A(71), B(107), C(193), D(24), E(0) #604662
詳解 (共 1 筆)
#1559411
碼頭試驗