49 Which of the following is one of the challenges engineers and workers had to face during the construction of the Qinghai-Tibet Railroad?
(A) Travelers from Beijing may suffer altitude sickness in Lhasa.
(B) The idea of a train trip is not as appealing as that of air travel.
(C) The tourism industry is impossible on the snow-covered permafrost.
(D) The railroad track may become bent or curved if frozen ground melts.

答案:登入後查看
統計: A(161), B(85), C(120), D(703), E(0) #2020318

詳解 (共 3 筆)

#3423206
翻譯:中國於2006年完成了青藏鐵路的建...
(共 629 字,隱藏中)
前往觀看
19
0
#3556337
19.【題組】49 Which of t...
(共 561 字,隱藏中)
前往觀看
11
0
#5098152

以下哪一項是青藏鐵路建設過程中工程師和工人所面臨的挑戰之一?

(A) 來自北京的旅客在拉薩可能會出現高原反應。

(B) 火車旅行的想法沒有飛機旅行的那麼吸引人。

(C) 在積雪覆蓋的多年凍土上,旅遊業是不可能的。

(D) 如果凍土融化,鐵軌可能會彎曲或彎曲。

8
1