5. If everything is on _____ , the construction work can be completed by the end of December as expected.
(A) rule
(B) battle
(C) temple
(D) schedule
答案:登入後查看
統計: A(31), B(7), C(38), D(928), E(0) #2818021
統計: A(31), B(7), C(38), D(928), E(0) #2818021