81 A NetBackup master server has commenced writing four long-running duplication jobs to an AdvancedDisk disk pool. The value of "Maximum concurrent jobs" for the storage unit and "Limit I/O streams" for the disk pool are both set to 4. There are 35 jobs queued on the master server that require this disk pool: 5 replication jobs with priority 9999 10 backup jobs with priority 999 20 duplication jobs with priority 99 Two restore jobs that require this disk pool are then submitted with default priority. Which job type goes active next?
(A) Backup
(B) Duplication
(C) Replication
(D) Restore

答案:登入後查看
統計: 尚無統計資料