3 A _______ was brought in to fix the damage of the external walls of the school building caused by the
salt air.
(A) conductor
(B) compiler
(C) contractor
(D) composer
答案:登入後查看
統計: A(79), B(65), C(165), D(32), E(0) #2995910
統計: A(79), B(65), C(165), D(32), E(0) #2995910
詳解 (共 6 筆)
#5610757
A)指揮
B)編纂者
C)承包商
D)作曲家
B)編纂者
C)承包商
D)作曲家
18
0
#5722883
A contractor承包商 was brought in to fix the damage of the external walls of the school building caused by the salt air.
一名承包商被請來修復因鹽分空氣造成的校舍外牆損壞。
conductor 導體;售票員;指揮
compiler 編輯
contractor 承包商
composer 作曲家
12
0