16、 在物料需求規劃(MRP,Material Requirement Planning)中,其最頂層之輸入需求為?
(A) Final assembly scheduling (FAS)
(B) Capacity requirements planning (CRP)
(C) Master production schedule (MPS)
(D) Operations sequencing (OS)
(E) Production activity control(PAC)
答案:登入後查看
統計: A(2), B(4), C(18), D(3), E(1) #873031
統計: A(2), B(4), C(18), D(3), E(1) #873031